Following so far (Hit — Dated evidence shows that every material part of the assessed forecast happened.)
0
Partly following (Partial hit — Dated evidence shows that at least one material part of the assessed forecast happened. Other parts are still open or went differently.)
60
Against the stated outcome (Miss — Dated evidence shows that the assessed outcome went against the forecast.)
0
Unresolved (Unresolved — The evidence has yet to show whether the forecasted outcome happened. Plans and related developments can still be recorded as checkpoints.)
102
Public performance and coverage
122 of 543 published Signals have at least one linked claim assessment. The number of claims eligible for assessment across all Signals is unmeasured.
These totals count one current published assessment per identifiable claim, including unresolved assessments. One Signal can contain several claims. Earlier coverage, timetable changes, safety notices and editorial cases without a matched assessment have their own counts.
The source directory contains 52 articles: 48 Long Term Signals and 4 standalone Long Term articles. These publications remain part of the Signals collection; this subset is not added to its total a second time.
434 of 434 current Workbench Signals have a recorded check. 0 have no recorded check for the current revision. This checks delivery of the published article.
Current Signals included in both partner feeds. Early and standalone Long Term are also distributed; they are outside this Signal-only count. Explicit withdrawals remain excluded.
Singapore’s Infocomm Media Development Authority (IMDA) reported the trial result. Its case-study page is from the same publisher.
The dates
IMDA released its report on . The case-study page was updated on . OnTheRice published the Signal on .
The limits
The release supports the energy savings reported for those two halls during the trial. Long-term savings, results at other sites and demand for independent verification remain open.
See later evidence beside what the original Signal said. Follow each case for its dates and remaining questions.
COP31’s opening date and city only. The exact starting time and later project delivery are separate.
Partly following · Updated
What we originally said
The world's next major climate conference, COP31, is scheduled to open in Antalya, Türkiye, at 10 am local time on 9 November 2026.
What happened
The UN climate secretariat reported from the opening day of COP31 in Antalya, Türkiye, on 9 November 2026. Independent delegates’ coverage describes business carried out in the opening plenary on the same day.
What we learned
This confirms the conference opened on the date and in the city named in the Signal. It does not verify an exact 10 a.m. start, an individual project award or delivery.
What remains open
The actual opening minute was not established. This is not evidence of cash paid, signed contracts or practical benefits from a climate project.
What to check next
For the project claims, check a dated award, financing record or implementation report for the exact project.
Evidence cited in the update
UNFCCC report from COP31’s opening day · Primary source · Public access · Opening day confirmed; exact start minute not supplied. · Event · Published · Checked
Festival dates and venue only; not the number of meetings, customers or contracts.
Partly following · Updated
Scheduled review · Planned
What we originally said
MAS release dated 15 Nov 2026 confirms Singapore FinTech Festival will run 18-20 November with 600+ sponsors/exhibitors and an expectation of more than 20,000 pre-scheduled meetings.
What happened
The Singapore FinTech Festival took place at Singapore EXPO from 18 to 20 November 2026. Two exhibitors recorded that the three-day event had concluded, and on-site coverage reported from its final day.
What we learned
The dates and venue named in the original Signal were confirmed. The earlier outcome about one vendor booking appointments is a separate finding. Neither establishes how many meetings the festival held or how many led to paid work.
What remains open
No audited meeting, sponsor or contract totals were checked for this note.
What to check next
Look for the organiser’s actual completed meeting count or documented paid work tied to an identified introduction.
Gkash exhibitor recap · Primary source · Public access · Exhibitor describes its own participation and the full event dates. · Event · Published · Checked
The Tokyo wards release date only. The later Yokohama comparison remains open.
Partly following · Updated
Scheduled review · Planned
What we originally said
November’s Tokyo wards prices are scheduled for 27 November; the wider November city prices are scheduled for 18 December.
What happened
Japan’s Statistics Bureau released the November retail price table for Tokyo’s wards on 27 November. Japan’s government data portal records the release at 08:30 JST.
What we learned
The Tokyo wards table came out on the date listed in the Signal. The wider city table is a separate release. Wait for it before comparing Tokyo and Yokohama for the same month.
What remains open
This verifies the Tokyo wards release date, not the wider city release, a November change in the gap or what a particular shop charged.
What to check next
Check the separate November city table after 18 December. Match the rice type and the 5 kg pack before comparing prices.
Evidence cited in the update
Statistics Bureau of Japan retail price survey release history · Primary source · Public access · Dated entry is for November products in Tokyo wards and nationally uniform price items, not Yokohama’s November city table. · Event · Published · Checked
Hanyu festival dates only. No finding on Shimotsuma’s booth, giveaway or sales.
Partly following · Updated
Scheduled review · Planned
What we originally said
The wider event runs on 21–22 November, but the city's announced appearance is for the first day only.
What happened
Hanyu’s municipal school reported that the 15th World Character Summit took place on both 21 and 22 November in Hanyu, Japan. Its report includes photos labelled by date.
What we learned
The wider event took place on the dates the original Signal named. That does not show whether Shimotsuma’s mascot booth opened, how many stickers it gave away or whether the giveaway led to sales.
What remains open
The municipal report does not provide Shimotsuma’s booth receipts or costs, and it gives no posting time beyond 22 November local time.
What to check next
A dated Shimotsuma recap could confirm the booth appearance. Use actual gift counts, sales and costs before drawing any conclusion about the giveaway.
Evidence cited in the update
Hanyu municipal school report on the two festival days · Primary source · Public access · Report dated 22 November in Japan; photos labelled for 21 and 22 November. No verified exact post time or sales data. · Event · Published · Checked
One signed agreement tied conditional water, sewer and community commitments to one South Carolina project. This is separate from a rule for future projects or a company dropping a site.
Partly following · Updated
What we originally said
Monitor actual project conditions and procurement notices for shared water systems, electricity monitoring, environmental assessment and community-benefit work.
What happened
On 16 November, Spartanburg County approved a development agreement with Numara and Valara for the site at 4000 South Pine Street in South Carolina. The signed agreement calls for water and sewer extensions where needed, annual in-person community meetings and reports on utility demand. These commitments depend on conditions in the agreement, including the county’s review of the project.
What we learned
A named project now has written conditions for utility and community work. That answers the first check in our Signal, not the next one. A supplier should check which work the conditions require and whether the developer has opened it for bids.
What remains open
The signed document does not show that the conditions were met, that a permit was issued, or that a contractor was hired or paid. It lists utility work needed for the site, not proof that neighbours received a new service or paid less.
What to check next
Look for a recorded development approval, a defined supplier tender or signed order, then check completion and payment separately.
Evidence cited in the update
Spartanburg County: signed development agreement, Articles VII and IX · Primary source · Public access · Official signed agreement names the parties, conditional public benefits and review steps. 16 November is the effective date shown; the full signing time is not given. · Event · Checked
Spartanburg County: final vote on three project agreements · Primary source · Public access · County summary confirms final third-reading approval. Approval of the agreement is not a separate construction permit or equipment purchase. · Event · Checked
Partial hit for the effect of community concerns on one project’s site choice. Not a second hit for a local planning rule.
Partly following · Updated
What we originally said
Public acceptance and credible utility protections could become a commercial advantage for data-centre projects, alongside land and electricity.
What happened
On 23 November in Aurora, Colorado, Vantage Data Centers said it would no longer pursue its original Trident site near East 48th Avenue. Vantage said community concerns prompted its search for alternatives. Aurora’s city attorney announced the decision at the council meeting, before a separate vote on a temporary pause for new data centres.
What we learned
In October, Vantage was still advancing the original site while looking at other options. In November, it dropped that site. This is one case where community concerns mattered to a developer’s site choice. If you are pricing work for a proposed campus, verify the current site before spending on a bid.
What remains open
This does not prove community opposition was the only reason, that the council vote forced the change, or that the whole project was cancelled. No replacement site, new supplier contract, cost or benefit from utility protections was verified.
What to check next
Check for a replacement site in the city’s planning records and any written water, power or community conditions. Verify costs or new contracts separately.
Evidence cited in the update
Denver Gazette: Vantage drops the original Trident site · Independent evidence · Public access · Quotes Vantage’s named public policy executive and reports the city attorney’s announcement before the vote. Not the developer’s formal withdrawal filing. · Event · Published · Checked
CBS Colorado: announcement at the Aurora council meeting · Independent evidence · Public access · Reports what the city attorney said about the original site. The disclosure clock is not the time Vantage made the decision. · Event · Published · Checked
New Central Cook forecast for the remaining Saturday hours and Sunday. This is not observed weather, market opening or a forecast result.
Milestone · Updated
What we originally said
At Daley Plaza, Saturday daytime looks drier than Sunday.
What happened
At 9:05 a.m. Chicago time on 28 November, the National Weather Service updated its Central Cook forecast. It no longer mentioned rain for the rest of Saturday. It still gave a 90% chance for Saturday night, with rain expected late, and close to 100% for Sunday. Daley Plaza’s organiser still listed Saturday hours of 11 a.m. to 9 p.m.
What we learned
The rain mentioned in the early Saturday forecast was not in the update for the rest of the day. If you can choose when to go, Saturday daytime still looks drier. Check the organiser and forecast again before leaving.
What remains open
No rain mentioned does not mean a 0% chance. This forecast covers Central Cook, not rain measured at the stalls. Posted hours do not prove the market opened or stayed open.
What to check next
Check a newer Central Cook bulletin and any same-day change to Daley Plaza hours. Compare actual weather on each day only when dated observations are available.
Evidence cited in the update
National Weather Service: 9:05 a.m. Central Cook forecast · Primary source · Public access · Forecast FPUS53 KLOT 281506, Central Cook ILZ104. The link advances to newer bulletins. A forecast is not an observation. · Event · Published · Checked
Christkindlmarket: Daley Plaza hours · Primary source · Public access · The organiser lists regular Saturday hours. It does not confirm that the gates were open when checked. · Checked
One CrossCountry service towards Plymouth at Birmingham New Street on 28 November 2026, and the specific 28–29 November ticket acceptance notice.
Milestone · Updated
What we originally said
A delay alone does not qualify.
What happened
At 3:27 p.m. UK time on 28 November, National Rail showed the CrossCountry train towards Plymouth scheduled at 3:12 p.m. from Birmingham New Street and expected at 3:38 p.m. It was marked as running late, not cancelled.
What we learned
For this notice, the option to use certain other train operators within two hours applies when the booked train is cancelled. This snapshot showed a delay. Check the status of your exact train rather than treating the general reduction as a cancellation.
What remains open
The board can change. This readback does not verify the train’s actual Birmingham departure, arrival, cause of delay, ticket acceptance or anyone’s fare.
What to check next
Before boarding, check the live status, last connection, and whether an alternative would take your exact ticket. Read the latest National Rail notice or check with station staff.
Woodlands departures from Singapore toward Johor. Land Transport Authority alert and visible outbound road segments only, on 28 November 2026.
Milestone · Updated
What we originally said
A newer ICA outbound notice or two newer pictures can change the immediate decision. No image here confirms the full crossing or proves which route is faster.
What happened
At 11:15 p.m. SGT on 28 November, LTA listed heavy traffic on the BKE towards Woodlands at the checkpoint exit. LTA’s flyover camera towards the checkpoint was timed 11:18 p.m. Its Causeway camera towards Johor was timed 11:19 p.m. These are two different road sections.
What we learned
A clear-looking picture does not cancel the earlier alert. The cameras show different parts of the trip, and the alert and pictures are minutes apart. Check both fresh outbound views and the latest official notice before leaving.
What remains open
These snapshots do not show the full queue, prove it had cleared, measure crossing time, or show that another route is faster. They do not prove that traffic was heavy and light at the same place and moment.
What to check next
Refresh both timestamps and look for a later LTA or ICA outbound notice. If a view is missing or stale, treat that stretch as unknown.
Evidence cited in the update
LTA OneMotoring: 11:15 p.m. BKE alert · Primary source · Public access · Changes as new alerts are posted; exact item read on 28 November. · Event · Checked
TEPCO’s regulated Kanto household B tariff model, 30 amps and 260 kWh. December 2026 and January 2027 bills at the same use.
Milestone · Updated
What we originally said
The January 2027 complete model total was not verified.
What happened
TEPCO’s notice dated 27 November lists ¥9,738 for December and ¥9,823 for January before government support. With the ¥260 credit, the January model comes to ¥9,563. The figures include tax and the renewable energy levy.
What we learned
Before the credit, the January model costs ¥85 more than December. After the credit, it costs ¥175 less. The January bill in this model covers December electricity use.
What remains open
TEPCO dated the notice but did not give an hour, so this does not say whether the notice preceded our Signal. These are model totals, not a paid household bill. They do not establish February or March totals.
What to check next
Compare actual bills only for the same plan, meter period and use. Check February and March against their own published figures.
England and Wales. UK Commons procedure only. No assessment of a real court deadline or legal claim.
Milestone · Updated
What we originally said
The final outcome of the debate was not yet confirmed in the parliamentary record checked.
What happened
On 27 November 2026, the House of Commons agreed to the Bill’s second reading and sent it to a public bill committee. The closing speech began at 1:58 p.m. UK time, after our Signal. The official record does not give a separate vote minute.
What we learned
We can now say how the debate ended. The Bill has not brought the proposed protection into force. This vote did not change readers’ current deadlines.
What remains open
The vote does not establish when the proposed rules would take effect, which cases they would cover, or whether any existing deadline would change.
What to check next
Check for the committee’s timetable and any amended Bill. Verify any legal start date and relevant court rules separately.
LEGO US listing for set 80118 only. No completed checkout or later resale.
Milestone · Updated
Scheduled review · Planned
What we originally said
LEGO US shows this box available at US$53.99 and marks it Retiring soon. Other sellers are still offering it. Retirement alone does not tell us what buyers will pay.
What happened
On 28 November, LEGO’s US shop displayed the Fortune Firecracker set at US$62.99, US$9 above the US$53.99 we recorded on 23 November. The page still showed it as available and marked it Retiring soon.
What we learned
Use the current checkout total, not the old sticker price. The new list price does not show that the set has retired or that it earns a premium on resale.
What remains open
Older snapshots can still display US$53.99. No purchase or final delivery cost was checked, and LEGO has not given an exact retirement date on this page.
What to check next
Compare the exact sealed set and the full delivered price. After shops stop selling it, look for repeat paid sales in comparable condition.
Evidence cited in the update
LEGO US official set 80118 product page · Primary source · Public access · Retailer’s live product display observed on the stated date. No stock history, completed checkout or actual price paid. · Event · Checked
The forwarder reported seeing shorter Suez voyages arrive alongside Cape-route ships, adding to vessel waits at Rotterdam and Antwerp. It also reported pressure on barge and feeder connections.
The later report supports the overlap. It does not establish a Rhine low-water cause, a matching individual shipment or a paid charge. It is the same partial already on the original Signal, not a second scored hit.
On 25 November, TechRadar listed the standard iPhone 17 as included with an eligible two-Pick T-Mobile plan. T-Mobile’s terms for offer S095 separately give a 5 November start, 36 monthly bill credits and a US$35 connection charge, plus tax.
TechRadar uses affiliate links. The offer terms and the report do not show anyone’s own bill, eligibility, or savings from switching. Check the final total against your current plan and the cost of keeping any subscriptions.
Singapore’s amended haze law took effect on 19 November 2026. The Government Gazette lists the commencement notice as S 841/2026. This confirms the legal step only.
This does not establish a paid assignment, a subcontract, a fee, repeat work, or a finding that any company caused haze.
Microsoft began rolling out Business Analytics to eligible early-access customers on 17 November. Its guide shows the Copilot Cowork screen reporting cost and task completion together, alongside satisfaction and estimated value.
Same partial recorded on the original Signal, not a second score. The new view reports estimated value and task measures; it does not independently check whether the work is correct or money was saved.
LG’s dated account and booth photos show that it presented battery storage, backup batteries and control software together at its RE+ exhibit in Las Vegas. An industry reporter covering the show also described the combined power setup and interviewed an LG product executive.
Same partial recorded on the original Signal; not an extra score. A separate Before the Headlines entry tracks later reporting. No live reliability test or paid contract was verified.
On 24 November, URA awarded the Town Hall Link site to a group of four companies: Sunshine Avenue, Sunshine Tower 1, Sunshine Tower 2 and Sunshine Mall. The tender price was about S$1.824 billion for the 99-year site.
This is the same partial outcome recorded on the original Signal, not a second hit. The NEA waste-system consultancy, approved connection drawings and supplier payments remain unverified.
The same 13 November Okta release was already credited as a partial result on the related 5 November Signal about bank AI-agent controls. It does not add another partial hit.
Assessment changed from Partly following to Not assessable.
The earlier label suggested the warning was an OTR prediction. The published Signal repeated a warning from the operator. The later notice is useful to travellers but should not count as a forecast hit.
Assessment changed from Partly following to Not assessable.
Open a Signal’s sources in the Evidence register to see recorded dates, access limits and links.
How to read a source link
Find the original record.
A regulator’s notice can tell you which products it covers. A company report can tell you what the company disclosed. Look for the page, table or sentence that supports the specific claim.
Look for a separate check.
News reports can add context. When several reports repeat the same announcement, they share one underlying source. Separate evidence comes from someone who did their own reporting, test or analysis.
Check dates and access.
Look for when the event happened, when the source reported it and when it was checked, where those dates are given. Some links require a login or payment. If you can see only part of a source, check which details are actually available to you.
Look for gaps and contrary evidence.
Check who, where and how long the record covers. Look for other evidence that points in a different direction. OnTheRice uses selected sources it can access, so coverage varies by topic, place, language and date.
What kind of statement are you reading?
Reported fact
What a record directly shows. If it is someone’s account of an event, check who made the statement.
Interpretation
What OnTheRice thinks the evidence may mean. Look for the reasoning and other possible explanations.
Estimate or forecast
An approximate figure or a view about what may happen next. Check the assumptions, time period and what later evidence could test.
Open question
Something the evidence available at the time leaves unresolved. Look for what information would answer it.
OnTheRice is responsible for what it publishes. AI helps find, organise and draft research. It can miss context or repeat an error. Use the linked evidence to check the claim for yourself.
To report a mistake or broken source link, send the permanent page link, the exact passage or problem and a dated source if you have one. Published Signal updates can show a correction alongside the original prediction and its publication date.
This list shows recent public Signal updates and publication revisions. Workbench and Early revision entries record publication dates. Their reasons and any change to the article’s conclusion are unavailable in this list. The Early archive shows earlier versions and available change details.