Skip to content

Trust, backed by evidence.

What we published. What happened. What we learned.

Published Signals
470
Claims assessed
155
Published lessons
23
Corrections & retractions
8

What happened next

Following so far
(Hit — Dated evidence shows that every material part of the assessed forecast happened.)
0
Partly following
(Partial hit — Dated evidence shows that at least one material part of the assessed forecast happened. Other parts are still open or went differently.)
52
Against the stated outcome
(Miss — Dated evidence shows that the assessed outcome went against the forecast.)
0
Unresolved
(Unresolved — The evidence has yet to show whether the forecasted outcome happened. Plans and related developments can still be recorded as checkpoints.)
103
Public performance and coverage

119 of 470 published Signals have at least one linked claim assessment. The number of claims eligible for assessment across all Signals is unmeasured.

These totals count one current published assessment per identifiable claim, including unresolved assessments. One Signal can contain several claims. Earlier coverage, timetable changes, safety notices and editorial cases without a matched assessment have their own counts.

Latest evidence publication shown

See the same assessed claims on OTR Learns.

Site-wide scorecard

Coverage and publication checks

Publications and evidence

  • Signals

    470

    Currently published Signals from both publishing paths. Original evidence is linked in the register.

    Latest recorded

  • Early

    24

    7 dated editions. 17 separately published Workbench articles. 2 dated revisions are retained separately and are not extra articles.

    Latest recorded

  • News Degrees

    3

    Distinct dated, published editions. Tutorials, worked examples, drafts and replaced editions are not counted.

  • Long Term

    52

    The source directory contains 52 articles: 48 Long Term Signals and 4 standalone Long Term articles. These publications remain part of the Signals collection; this subset is not added to its total a second time.

    Latest recorded

  • Before the Headlines

    28

    Published timing comparisons. 0 additional Workbench entries without a structured assessment in this total.

    Latest recorded

  • Came True

    21

    Published evidence comparisons. 0 additional Workbench entries without a structured assessment in this total.

    Latest recorded

  • OTR Learns

    155

    Current claim assessments shared with this scorecard. 60 curated cases and 263 published Signal notes supply context. Some cover the same claim.

    Latest recorded

  • Updated Signals

    150

    Distinct published Signals with substantive published notes. A Signal may have several notes.

    Latest recorded

  • Evidence register

    470

    Published Signals in scope. Each row links to the original. Access and dates are shown where recorded.

  • Source coverage

    Not yet measured

    Site-wide source access and completeness have no verified denominator. Source links, dates and limits are shown on individual records.

Corrections and verification

  • Corrections and retractions

    8

    Published Signal correction and retraction records. Earlier wording and recorded reasons stay in the history.

    Latest recorded

  • Research independence

    No disclosures on file

    Ownership, interests, sponsorship and conflicts are declared through the public disclosure record.

  • Public challenges

    Reader reporting

    Support takes challenges and source links. Published corrections appear in Change history. Submissions are private.

  • Workbench Signal readback

    360 of 361 checked matched

    361 of 361 current Workbench Signals have a recorded check. 0 have no recorded check for the current revision. This checks delivery of the published article.

    Latest recorded

  • Evidence publication readback

    49 of 49

    Exact publication receipts across Came True and Before the Headlines. These checks measure delivery.

    Latest recorded

  • Availability and delivery

    Not continuously measured

    Uptime, delivery to readers and independent accuracy have no verified site-wide measure here.

Reader tools and discovery
  • Home and daily popup

    Announcement published

    The popup uses the Singapore calendar day. Visitor impressions and dismissals are unmeasured.

    Latest recorded

  • Signals in partner RSS

    466

    Current Signals included in both partner feeds. Early and standalone Long Term are also distributed; they are outside this Signal-only count. Explicit withdrawals remain excluded.

    Latest recorded

  • Comtex RSS

    Same publishing stream

    The Comtex and Newstex feeds use the same current articles. Partner ingestion is confirmed separately.

  • Telegram alerts

    Opt-in alerts

    Readers can subscribe to new publications. This scorecard does not track delivery to readers.

  • Topics

    4 topics

    Public topic pages. Follow preferences are device-local.

  • Search

    Reader tool

    Search and filters are available. Search usage and result quality are unmeasured.

  • Membership

    Reader access

    Public information about reading access and membership.

  • Dashboard

    Sign-in required

    Personal reading and account activity stay private.

  • Method

    Public guide

    Read how Signals use sources and how later evidence is assessed.

  • About

    Public information

    Find OnTheRice’s publisher information and its editorial purpose.

  • Business and enquiries

    Public briefs

    The published page links to its examples and the enquiry route. Enquiries are private.

  • Public page discovery

    Public directory

    Canonical public pages are available through navigation and sitemaps. Search-engine indexing is unmeasured.

  • Privacy

    Public policy

    Read how the site handles data and what readers can control.

  • Terms

    Public policy

    Read the current terms for using OnTheRice.

From claim to learning

  1. Original claim
  2. Dated evidence
  3. Outcome
  4. Lesson
Explore the evidence

The evidence behind our work.

Follow the sources from the original claim to what we learned.

A clear trace from claim to learning

  1. Original claim

    Read what OnTheRice originally published and when.

  2. Dated evidence

    Check the source, when it was published and what it covers.

  3. Our assessment

    Compare what happened with the original claim and record its current status.

  4. What we learned

    Record what the evidence changed and what still needs checking.

Example claim record

What remains uncertain

No approved final allotment, first exchange trade, cash received by Coal India, or use of the proceeds has been verified here. The gross offer figure is not the seller’s cash after costs. This does not repeat the earlier partial result about who is selling the shares.

Explore more evidence

How the system learns.

We use later evidence to improve the next assessment and record what changed.

Sample timeline

See when the Signal, its source and the assessment were published.

  1. Claim logged
  2. Evidence checked
  3. Update published
  4. Lesson recorded
  1. Signal published
  2. Source published
  3. Assessment published
  4. What we learnedRead the published lesson
Explore OTR Learns

Browse the Trust records

Evidence register

Published Signals and their evidence

470 published Signals

  1. Europe Is Spending €525 Million on Chips. The First Winners May Sell the Tools to Design Them.

    First published

    7 original public sources
  2. Starlink Is Building a Phone Network. The Earliest Money May Go to Companies That Own the Ground.

    First published

    12 original public sources
  3. Australia's Social-Media Ban May Create a Market for Proving Age Without Giving Away Identity.

    First published

    14 original public sources
  4. AI's Next Scarce Resource May Not Be Electricity. It May Be Permission to Build.

    First published

    7 original public sources
  5. AI Is Eating the Chip Supply. The Next Winners May Be Companies That Repair Old Phones.

    First published

    5 original public sources
  6. India Is Funding the Battery Industry From Both Ends. The Hidden Opportunity Is in the Middle.

    First published

    5 original public sources
  7. Your closet could fund holiday gifts, but miss the sale you want to buy

    First published

    3 original public sources
  8. A longer wash could cost less, even at peak prices

    First published

    8 original public sources
  9. A road detour could raise the fare a transit subsidy does not cover

    First published

    4 original public sources
  10. A faster energy upgrade could beat a bigger one

    First published

    4 original public sources
  11. Car makers could get a new reason to help social-lease drivers charge

    First published

    4 original public sources
  12. A backup cold room may share the first fridge’s weakness

    First published

    3 original public sources
  13. More food choice may need smaller deliveries

    First published

    3 original public sources
  14. AI shopping could favour ready-to-use kits

    First published

    3 original public sources
  15. Choose backup dairy by its storage instructions

    First published

    2 original public sources
  16. Claim missing French energy aid and check winter power protection

    First published

    4 original public sources
  17. Verify the shop before sharing your customs ID

    First published

    4 original public sources
  18. Check the HAIARA W5 PRO recall before packing

    First published

    3 original public sources
  19. Check irrigation water before locking next season’s crop orders

    First published

    3 original public sources
  20. Cat A COE costs more: compare whole-car quotes

    First published

    3 original public sources

Source walkthrough

What did the data-centre trial show?

The claim

Digital Realty cut total energy use by 2–3% across two 4.5 MW data halls.

Read the original Signal
The source
Singapore’s Infocomm Media Development Authority (IMDA) reported the trial result. Its case-study page is from the same publisher.
The dates
IMDA released its report on . The case-study page was updated on . OnTheRice published the Signal on .
The limits
The release supports the energy savings reported for those two halls during the trial. Long-term savings, results at other sites and demand for independent verification remain open.

What happened next

See later evidence beside what the original Signal said. Follow each case for its dates and remaining questions.

  • Thousands of Black Friday deals are live right now. These are the 175 best · Partly following · Original · Later evidence

    On 25 November, TechRadar listed the standard iPhone 17 as included with an eligible two-Pick T-Mobile plan. T-Mobile’s terms for offer S095 separately give a 5 November start, 36 monthly bill credits and a US$35 connection charge, plus tax.

    TechRadar uses affiliate links. The offer terms and the report do not show anyone’s own bill, eligibility, or savings from switching. Check the final total against your current plan and the cost of keeping any subscriptions.

Final offer price only. A traded price, full allotment and cash receipt are not verified.

Partly following · Updated

Scheduled review · Planned

What we originally said
A separate public valuation could help investors compare Mahanadi and the parent’s retained stake.
What happened
Mahanadi’s final prospectus, filed on 23 November, fixes the public offer price at ₹136 per share. Eligible employees in the reserved portion get a ₹6 discount. The document lists a gross offer amount of ₹89.81 billion after that discount, subject to final allotment.
What we learned
The offer now has a final price. This supports the pricing step we flagged for a separate comparison of Mahanadi and Coal India’s retained stake. It is a price for the offer, not an exchange trade or proof of what investors will pay after listing.
What remains open
No approved final allotment, first exchange trade, cash received by Coal India, or use of the proceeds has been verified here. The gross offer figure is not the seller’s cash after costs. This does not repeat the earlier partial result about who is selling the shares.
What to check next
Check the signed basis of allotment and first NSE or BSE trades. Verify Coal India’s net cash receipt in a separate dated filing.
Evidence cited in the update
  • Mahanadi Coalfields final prospectus, cover and offer terms · Primary source · Public access · Issuer prospectus hosted by a bookrunner; SEBI’s filing index gives 23 November, date only. The offer amount is subject to final allotment. No evidence of funds paid or first trade. · Event · Published · Checked

Read the dated update and full evidence · Read the original Signal

Required customer checks for covered remote access to advanced chips. No finding of wrongdoing or new paid work.

Partly following · Updated

What we originally said
Second-order effect: Chip controls increase scrutiny of rented computing power. If authorities find that customers can gain access without directly importing equipment, they may demand stronger checks on remote users, where existing law permits or requires them.
What happened
A U.S. Commerce Department rule took effect on 19 November 2026. It requires stronger checks on customers and who ultimately owns or controls them in certain overseas advanced-computing transactions.
What we learned
Our Signal said regulators might require closer checks on people who rent advanced computing power from abroad. The new rule confirms the requirement for covered transactions, even when the customer does not buy the chips.
What remains open
The rule does not cover all remote users. Its scope includes specified advanced chips and affected customers, with exceptions and a transition for certain existing providers. It does not prove any company broke the rules, or that an audit supplier was hired or paid.
What to check next
Look for a dated provider report showing the required checks were applied or a named buyer paid for outside compliance work.
Evidence cited in the update
  • U.S. Federal Register: Addressing Remote Access to Advanced Semiconductors · Primary source · Public access · The effective interim final rule and its customer checks are official. Section 744.24 specifies the covered transactions. The rule does not document how any named customer was treated or whether a supplier was paid. · Event · Published · Checked

Read the dated update and full evidence · Read the original Signal

One competition-law step for INPEX’s proposed purchase of Woodside’s 21% Bonaparte stake. Not approval of all conditions or completion of the sale.

Partly following · Updated

What we originally said
INPEX has agreed to acquire Woodside’s 21% interest, subject to conditions including regulatory approval; completion would lift its 53% interest to 74%. TotalEnergies holds 26%.
What happened
On 13 November 2026, Australia’s competition regulator decided INPEX did not have to notify it of the proposed purchase of Woodside’s 21% stake in Bonaparte. The determination was posted on 16 November.
What we learned
Our 5 November Signal said the purchase depended on regulatory conditions. This decision removes one filing requirement for the exact purchase. It supports that step only.
What remains open
The waiver does not prove the sale closed, other approvals were obtained, Woodside was paid, or INPEX’s stake rose to 74%. It does not approve carbon storage or establish a paying customer.
What to check next
Look for a dated completion notice from INPEX or Woodside, or a title register entry showing the share transfer.
Evidence cited in the update

Read the dated update and full evidence · Read the original Signal

  • Government Gazette, Subsidiary Legislation Supplement No. 48, commencement notice S 841/2026 · Partly following · Original · Later evidence

    Singapore’s amended haze law took effect on 19 November 2026. The Government Gazette lists the commencement notice as S 841/2026. This confirms the legal step only.

    This does not establish a paid assignment, a subcontract, a fee, repeat work, or a finding that any company caused haze.

Partial hit: the EU adopted import quotas that cover several countries besides China. The earlier reported China figure and the benefits for EU plants are not confirmed by this measure.

Partly following · Updated

Scheduled review · Planned

What we originally said
Reports describe a 350,000 first-year allocation for Chinese-built hybrid vehicles, not a 350,000 ceiling for all EU hybrid imports. Other exporting countries could also face safeguards.
What happened
The European Commission adopted a temporary import rule on 23 November. It was published on 24 November and puts quotas on certain new hybrid vehicles from China, Japan, South Korea, the United Kingdom and other origins. The quotas are due to start on 1 December and run through 18 June 2027.
What we learned
The published rule confirms the part of the Signal that said the limits could reach countries beyond China. It names the origins and sets separate quotas.
What remains open
The quotas are not in force yet. This 200-day rule is not confirmation of the reported 350,000 first-year allocation. We have not verified a quota filling up, an importer changing suppliers, extra factory output, or a profit gain.
What to check next
From 1 December, check EU customs records for use of the quota for a named origin and match later sourcing or output changes to a specific vehicle model.
Evidence cited in the update

Read the dated update and full evidence · Read the original Signal

Published changes and notices

Regular SQ261 arrivals after the opening day. The earlier first-flight check is unchanged; no onward journey was verified.

Milestone · Updated

Scheduled review · Planned

What we originally said
Before the first scheduled flight, confirm the live flight status and that the trip planner offers the dated bus and onwards train for the airport-to-destination direction. Recheck after landing.
What happened
Flightera marks the regular SQ261 as landed at Western Sydney on 24 and 25 November, around 9:50–9:55 pm Sydney time, against a 10:20 pm schedule. The airport’s launch notice confirms the daily route but does not give actual landing times for these flights.
What we learned
The regular service ran after opening day. Check your own arrival and allow for border checks and bags, then enter the airport bus and onward train as one dated trip.
What remains open
Flight trackers use different clocks. These times are approximate and do not confirm when a passenger reached the bus stop, or whether any bus-to-train connection was made.
What to check next
Use the official trip planner for your date and time. Check the weekend rail changes for 27–28 November before relying on the St Marys train.
Evidence cited in the update
  • Flightera flight history for SQ261 · Independent evidence · Public access · The recent-flights table lists completed 24 and 25 November WSI arrivals. Tracker times are approximate. · Checked
  • Western Sydney International opening notice · Primary source · Public access · Identifies the daily route and SQ261; planned opening-day notice, not a later flight or passenger transfer log. · Published · Checked

Read the dated update and full evidence · Read the original Signal

New Thorn lab results only. The earlier Langis assessment and its score stay unchanged.

Milestone · Updated

What we originally said
Read the original wording in the published update.
What happened
On 25 November, Brixton released test results from two targets at Thorn in British Columbia, Catalyst and Sentinel. It said ALS prepared and tested the rock samples. On 29 September, Brixton had already said that drilling at Thorn was finished and results for both targets were still pending.
What we learned
The new release shows that two Thorn targets produced lab results. It does not show that the November share sale paid for the drilling.
What remains open
No lab invoice, payment date or new supplier order is shown. The earlier drilling dates rule out treating these results as proof of new drilling paid for by the November raise.
What to check next
For any new supplier opportunity, check a dated work order or a programme budget tied to the new money before paying for staff or equipment.
Evidence cited in the update
Evidence pointing the other way
  • Brixton: Thorn drilling was complete in September · Primary source · Public access · The company said Thorn drilling was complete and Catalyst and Sentinel results were pending, before the November financing. · Published · Checked

Read the dated update and full evidence · Read the original Signal

Newly retrieved signed court record for a separate US end-user class. This historical evidence does not change the original price or payout test.

Newly disclosed evidence · Updated

Scheduled review · Planned

What we originally said
The EU decision can matter for a damages claim. IFF’s filing also reports that a US court gave final approval to its direct-purchaser settlement on 16 September 2026. Neither point establishes whether a particular buyer received money or qualifies for a claim. The US case does not establish a refund on your European or Asian contract.
What happened
We checked the signed September 16 order alongside IFF’s filing. The order applies to a separate group of end users, not the direct buyers named in IFF’s filing. The court-authorised notice for direct buyers lists a December 8 hearing.
What we learned
The signed order cannot confirm approval for direct buyers. IFF reported paying US$26 million into the direct-buyer fund, but we still have no proof that an individual buyer received money.
What remains open
We have not found a final order in the direct-buyer case or verified a claim window or a payment to a buyer. The December hearing can be rescheduled.
What to check next
Check the signed order in the direct-purchaser case, 2:23-cv-02174, after the scheduled hearing. Check the administrator separately for any claim window, and a receipt before saying a buyer was paid.
Evidence cited in the update
Evidence pointing the other way
  • IFF 10-Q filed November 3 · Primary source · Public access · Issuer says September 16 final approval in its direct-purchaser paragraph. No buyer payout shown. · Published · Checked

Read the dated update and full evidence · Read the original Signal

Docling’s 25 November release reports missing requested PDF pages in its native conversion path. This is separate from the original wrong-text example.

Milestone · Updated

Scheduled review · Planned

What we originally said
Open the official PDF at the exact page. Compare the section number, heading and words you are using with the extracted text. If they disagree, work from the original and keep the extracted version out of the decision. If your team uses Docling Parse, test the newer version on the same page in an approved test system before replacing any records.
What happened
Docling says v2.153.0 now warns when its PDF converter gets fewer pages than requested. The linked maintainer test simulated a conversion that stopped early. The converter flagged the missing pages and kept the pages it could read.
What we learned
When using this version and conversion path, check for a missing-page warning and match the output page numbers to the range you asked for. Then check the exact words you are quoting against the official PDF.
What remains open
This change reports absent pages. It does not recover them or prove that text on returned pages is correct. The project tested a simulated early stop, not every document or export setting.
What to check next
If any page is missing, reopen that page in the official PDF and do not rely on extracted text until you confirm the page and wording.
Evidence cited in the update
  • Docling v2.153.0 release · Primary source · Public access · Release lists missing-page reporting in the native pipeline only. · Event · Published · Checked
  • Docling maintainers: missing-page test and result · Primary source · Public access · Maintainer test simulated an early end to page delivery; no general extraction-accuracy result. · Event · Published · Checked

Read the dated update and full evidence · Read the original Signal

Two 25 November HyperFrames Studio preview fixes. These are separate from the original paused-colour test and do not establish an export change.

Milestone · Updated

Scheduled review · Planned

What we originally said
A difference on the editor screen does not show a difference in the file the client approved. Keep those two checks separate.
What happened
HyperFrames says v0.9.94 fixed a case where a saved preview displayed the frame just before the position you selected. In v0.9.95 the text toolbar began showing the colour set in the project stylesheet.
What we learned
The release notes describe two changes to what Studio displays. Before changing a client delivery, pause at the same time in Studio and the approved video. Compare the actual frame rather than relying only on the toolbar colour.
What remains open
These are the maintainers’ release notes. We did not test a project or find evidence that an approved video changed. Neither note repeats or independently verifies the original colour test.
What to check next
On an authorised copy, compare the same frame in Studio and in the approved file. If needed, make a short test export without changing settings.
Evidence cited in the update
  • HyperFrames official release v0.9.94 · Primary source · Public access · Maintainer release lists the after-save playhead fix for a particular preview. · Event · Published · Checked
  • HyperFrames official release v0.9.95 · Primary source · Public access · Maintainer release lists the toolbar swatch fix for text colour set by the stylesheet. · Event · Published · Checked

Read the dated update and full evidence · Read the original Signal

Maersk’s 24 November empty-container return instructions for named UK ports and depots. Separate from the earlier network update, loaded-container movements and the original Suez–Rhine forecast.

Plan changed · Updated

Scheduled review · Planned

What we originally said
Importers may face earlier cargo arrivals but fewer reliable inland options. Existing logistics operators could earn fees only when a confirmed alternative saves the customer money.
What happened
On 24 November, Maersk told hauliers that London Gateway Port would stop taking empty containers from noon. It had reported the port open for those returns on 17 November. On 24 November it directed drivers to check MATS Online for their return location before dispatch.
What we learned
The carrier changed its written empty-return instructions for these locations. Check the current return location for your exact container before sending a truck. The notice listed Pentalver London Gateway and other alternatives only when directed and subject to weather and space.
What remains open
The dated notice does not show that London Gateway is still closed, that a depot has space today, or that anyone paid an extra fee. It does not cover loaded imports and does not tie the change to Suez routing.
What to check next
Check your current Maersk booking instructions for the return depot, container type and confirmed slot before dispatch. A current dated reopening notice would supersede this snapshot.
Evidence cited in the update

Read the dated update and full evidence · Read the original Signal

Published evidence comparisons

  • Introducing Microsoft Agent 365 Business Analytics · Partial outcome · Original · Later evidence

    Microsoft began rolling out Business Analytics to eligible early-access customers on 17 November. Its guide shows the Copilot Cowork screen reporting cost and task completion together, alongside satisfaction and estimated value.

    Same partial recorded on the original Signal, not a second score. The new view reports estimated value and task measures; it does not independently check whether the work is correct or money was saved.

  • LG Energy Solution Showcases Integrated Power Infrastructure for AI Data Centers at RE+ 2026 · Partial outcome · Original · Later evidence

    LG’s dated account and booth photos show that it presented battery storage, backup batteries and control software together at its RE+ exhibit in Las Vegas. An industry reporter covering the show also described the combined power setup and interviewed an LG product executive.

    Same partial recorded on the original Signal; not an extra score. A separate Before the Headlines entry tracks later reporting. No live reliability test or paid contract was verified.

  • Tender award for URA sale site at Town Hall Link marks a key milestone in the development of Jurong Lake District · Partial outcome · Original · Later evidence

    On 24 November, URA awarded the Town Hall Link site to a group of four companies: Sunshine Avenue, Sunshine Tower 1, Sunshine Tower 2 and Sunshine Mall. The tender price was about S$1.824 billion for the 99-year site.

    This is the same partial outcome recorded on the original Signal, not a second hit. The NEA waste-system consultancy, approved connection drawings and supplier payments remain unverified.

  • First look inside the ‘Stranger Things’ themed diner in New York City · Partial outcome · Original · Later evidence

    NBC New York reported from a Stranger Things diner that opened in New York City on 18 November. The operator, Bucket Listers, worked with Netflix and sells tickets to the experience.

    One authorised experience opened. It was announced before our Signal and was not shown to arise from the prequel announcement. No verified ticket receipts, attendance or profit. Same partial as the Signal update, not a second scored result.

  • EX1550543: Exchange Online mailbox access and recovery · Partial outcome · Original · Later evidence

    At 10:13 a.m. Singapore time, Microsoft was still tracking messages that built up during the incident while Exchange Online recovered. Microsoft marked Exchange Online restored at 12:15 p.m. SGT.

    Partial only. The delay during recovery is documented, but no company’s reconciliation of requests, receipt of a particular message, or paid cleanup work was verified. This is the same partial already on the original Signal, not another scored hit.

  • Singapore Airlines’ first Western Sydney service landed · Partial outcome · Original · Later evidence

    On 23 November, Singapore Airlines flight SQ261 landed at Western Sydney International. A flight tracker recorded 7:42 p.m. local time. The original Signal quoted a different flight number and 10:20 p.m. for that day.

    This checks the first arrival only. It does not confirm that a passenger caught the onward bus or train, or that a 10:20 p.m. arrival happened that day. It links the existing partial hit and does not add another hit.

Browse updated Signals · Browse evidence comparisons · Read what OnTheRice learned

What we got wrong

See cases where later evidence went against the original Signal.

No verdicts marked “Against the stated outcome” appear in the public Signal update register.

Corrections and retractions

Report an error or challenge a claim

Source transparency

Open a Signal’s sources in the Evidence register to see recorded dates, access limits and links.

How to read a source link

Find the original record.
A regulator’s notice can tell you which products it covers. A company report can tell you what the company disclosed. Look for the page, table or sentence that supports the specific claim.
Look for a separate check.
News reports can add context. When several reports repeat the same announcement, they share one underlying source. Separate evidence comes from someone who did their own reporting, test or analysis.
Check dates and access.
Look for when the event happened, when the source reported it and when it was checked, where those dates are given. Some links require a login or payment. If you can see only part of a source, check which details are actually available to you.
Look for gaps and contrary evidence.
Check who, where and how long the record covers. Look for other evidence that points in a different direction. OnTheRice uses selected sources it can access, so coverage varies by topic, place, language and date.

What kind of statement are you reading?

Reported fact
What a record directly shows. If it is someone’s account of an event, check who made the statement.
Interpretation
What OnTheRice thinks the evidence may mean. Look for the reasoning and other possible explanations.
Estimate or forecast
An approximate figure or a view about what may happen next. Check the assumptions, time period and what later evidence could test.
Open question
Something the evidence available at the time leaves unresolved. Look for what information would answer it.

Try two more source checks

Research independence

OnTheRice is responsible for what it publishes. AI helps find, organise and draft research. It can miss context or repeat an error. Use the linked evidence to check the claim for yourself.

Ownership
No public disclosure on file.
Editorial and financial interests
No public disclosure on file.
Sponsorship
No public disclosure on file.
Conflicts of interest
No public disclosure on file.

Corrections and challenges

To report a mistake or broken source link, send the permanent page link, the exact passage or problem and a dated source if you have one. Published Signal updates can show a correction alongside the original prediction and its publication date.

Change history

See dated changes to published research. The original publication date and the update date describe different events.

This list shows recent public Signal updates and publication revisions. Workbench and Early revision entries record publication dates. Their reasons and any change to the article’s conclusion are unavailable in this list. The Early archive shows earlier versions and available change details.

Browse Signal update histories · Browse Early revisions

Lessons for research agents