Skip to content

Trust, backed by evidence.

What we published. What happened. What we learned.

Published Signals
430
Claims assessed
146
Published lessons
19
Corrections & retractions
7

What happened next

Following so far
(Hit — Dated evidence shows that every material part of the assessed forecast happened.)
0
Partly following
(Partial hit — Dated evidence shows that at least one material part of the assessed forecast happened. Other parts are still open or went differently.)
42
Against the stated outcome
(Miss — Dated evidence shows that the assessed outcome went against the forecast.)
0
Unresolved
(Unresolved — The evidence has yet to show whether the forecasted outcome happened. Plans and related developments can still be recorded as checkpoints.)
104
Public performance and coverage

115 of 430 published Signals have at least one linked claim assessment. The number of claims eligible for assessment across all Signals is unmeasured.

These totals count one current published assessment per identifiable claim, including unresolved assessments. One Signal can contain several claims. Earlier coverage, timetable changes, safety notices and editorial cases without a matched assessment have their own counts.

Latest evidence publication shown

See the same assessed claims on OTR Learns.

Site-wide scorecard

Coverage and publication checks

Publications and evidence

  • Signals

    430

    Currently published Signals from both publishing paths. Original evidence is linked in the register.

    Latest recorded

  • Early

    22

    7 dated editions. 15 separately published Workbench articles. 2 dated revisions are retained separately and are not extra articles.

    Latest recorded

  • Long Term

    52

    The source directory contains 52 articles: 48 Long Term Signals and 4 standalone Long Term articles. These publications remain part of the Signals collection; this subset is not added to its total a second time.

    Latest recorded

  • Before the Headlines

    20

    Published timing comparisons. 0 additional Workbench entries without a structured assessment in this total.

    Latest recorded

  • Came True

    16

    Published evidence comparisons. 0 additional Workbench entries without a structured assessment in this total.

    Latest recorded

  • OTR Learns

    146

    Current claim assessments shared with this scorecard. 60 curated cases and 229 published Signal notes supply context. Some cover the same claim.

    Latest recorded

  • Updated Signals

    140

    Distinct published Signals with substantive published notes. A Signal may have several notes.

    Latest recorded

  • Evidence register

    430

    Published Signals in scope. Each row links to the original. Access and dates are shown where recorded.

  • Source coverage

    Not yet measured

    Site-wide source access and completeness have no verified denominator. Source links, dates and limits are shown on individual records.

Corrections and verification

  • Corrections and retractions

    7

    Published Signal correction and retraction records. Earlier wording and recorded reasons stay in the history.

    Latest recorded

  • Research independence

    No disclosures on file

    Ownership, interests, sponsorship and conflicts are declared through the public disclosure record.

  • Public challenges

    Reader reporting

    Support takes challenges and source links. Published corrections appear in Change history. Submissions are private.

  • Workbench Signal readback

    321 of 321 checked matched

    321 of 321 current Workbench Signals have a recorded check. 0 have no recorded check for the current revision. This checks delivery of the published article.

    Latest recorded

  • Evidence publication readback

    36 of 36

    Exact publication receipts across Came True and Before the Headlines. These checks measure delivery.

    Latest recorded

  • Availability and delivery

    Not continuously measured

    Uptime, delivery to readers and independent accuracy have no verified site-wide measure here.

Reader tools and discovery
  • Home and daily popup

    Announcement published

    The popup uses the Singapore calendar day. Visitor impressions and dismissals are unmeasured.

    Latest recorded

  • Signals in partner RSS

    426

    Current Signals included in both partner feeds. Early and standalone Long Term are also distributed; they are outside this Signal-only count. Explicit withdrawals remain excluded.

    Latest recorded

  • Comtex RSS

    Same publishing stream

    The Comtex and Newstex feeds use the same current articles. Partner ingestion is confirmed separately.

  • Telegram alerts

    Opt-in alerts

    Readers can subscribe to new publications. This scorecard does not track delivery to readers.

  • Topics

    4 topics

    Public topic pages. Follow preferences are device-local.

  • Search

    Reader tool

    Search and filters are available. Search usage and result quality are unmeasured.

  • Membership

    Reader access

    Public information about reading access and membership.

  • Dashboard

    Sign-in required

    Personal reading and account activity stay private.

  • Method

    Public guide

    Read how Signals use sources and how later evidence is assessed.

  • About

    Public information

    Find OnTheRice’s publisher information and its editorial purpose.

  • Business and enquiries

    Public briefs

    The published page links to its examples and the enquiry route. Enquiries are private.

  • Public page discovery

    Public directory

    Canonical public pages are available through navigation and sitemaps. Search-engine indexing is unmeasured.

  • Privacy

    Public policy

    Read how the site handles data and what readers can control.

  • Terms

    Public policy

    Read the current terms for using OnTheRice.

From claim to learning

  1. Original claim
  2. Dated evidence
  3. Outcome
  4. Lesson
Explore the evidence

The evidence behind our work.

Follow the sources from the original claim to what we learned.

A clear trace from claim to learning

  1. Original claim

    Read what OnTheRice originally published and when.

  2. Dated evidence

    Check the source, when it was published and what it covers.

  3. Our assessment

    Compare what happened with the original claim and record its current status.

  4. What we learned

    Record what the evidence changed and what still needs checking.

Example claim record

What remains uncertain

This is worker-safety software, not Itron’s grid-edge rollout. The company did not disclose the price, what was paid, how much has been rolled out or whether PPL will renew.

Explore more evidence

How the system learns.

We use later evidence to improve the next assessment and record what changed.

Sample timeline

See when the Signal, its source and the assessment were published.

  1. Claim logged
  2. Evidence checked
  3. Update published
  4. Lesson recorded
  1. Signal published
  2. Source published
  3. Assessment published
  4. What we learnedRead the published lesson
Explore OTR Learns

Browse the Trust records

Evidence register

Published Signals and their evidence

430 published Signals

  1. Toyota’s new Sienna estimate improves in town. On the highway it goes the other way.

    First published

    4 original public sources
  2. TradeNet will take the filing. Will your export certificate be ready?

    First published

    5 original public sources
  3. Extra campaign posts can leave a local food budget unchanged

    First published

    5 original public sources
  4. Germany kept grid aid. Why does Rosenheim still list a higher January tariff?

    First published

    15 original public sources
  5. Japan’s tracked rice got cheaper. More kilos still left the shelves.

    First published

    5 original public sources
  6. Household-goods shops sold more online. Check what happened to their other sales.

    First published

    6 original public sources
  7. Voice Drive is now standalone. Can listeners still make out the words?

    First published

    4 original public sources
  8. A cheap AI prompt can still leave a bigger bill for the answer

    First published

    5 original public sources
  9. A proposed new transport approver does not tell you who can charge today.

    First published

    6 original public sources
  10. Restarting a dormant business account? Check the new fee before you budget

    First published

    6 original public sources
  11. Test one design before you order a box of creator merch

    First published

    6 original public sources
  12. A legal AI link can find the case. Does the passage support the answer?

    First published

    7 original public sources
  13. Thakral expects S$56.5m from a share sale. Has the cash arrived?

    First published

    6 original public sources
  14. A VThanks ticket can sell before the organiser can count on the money

    First published

    6 original public sources
  15. An AI shopping answer can name your shop and still show the wrong offer.

    First published

    4 original public sources
  16. Japan’s customs software operator announced a rollback. A row on screen is not a receipt.

    First published

    6 original public sources
  17. Green 100 Bronze checks the company. What does your tender ask for?

    First published

    6 original public sources
  18. Two Switch 2 listings show the same price. Check which battery you can replace.

    First published

    7 original public sources
  19. The Talos trial can show the dashboard. Can your team restore without it?

    First published

    5 original public sources
  20. Before a building meets Jurong’s waste pipes, leave room for the connection

    First published

    4 original public sources

Source walkthrough

What did the data-centre trial show?

The claim

Digital Realty cut total energy use by 2–3% across two 4.5 MW data halls.

Read the original Signal
The source
Singapore’s Infocomm Media Development Authority (IMDA) reported the trial result. Its case-study page is from the same publisher.
The dates
IMDA released its report on . The case-study page was updated on . OnTheRice published the Signal on .
The limits
The release supports the energy savings reported for those two halls during the trial. Long-term savings, results at other sites and demand for independent verification remain open.

What happened next

See later evidence beside what the original Signal said. Follow each case for its dates and remaining questions.

  • First look inside the ‘Stranger Things’ themed diner in New York City · Partly following · Original · Later evidence

    NBC New York reported from a Stranger Things diner that opened in New York City on 18 November. The operator, Bucket Listers, worked with Netflix and sells tickets to the experience.

    One authorised experience opened. It was announced before our Signal and was not shown to arise from the prequel announcement. No verified ticket receipts, attendance or profit. Same partial as the Signal update, not a second scored result.

Five-year utility software agreement only; same event as the earlier update. Not grid-edge adoption, receipts or renewals.

Partly following · Updated

What we originally said
Seek paid multiyear deployments and renewals.
What happened
On 17 November, Itron said utility PPL selected its Worker Safety software under a five-year enterprise agreement. The agreement extends an initial rollout in Pennsylvania.
What we learned
A utility committed to a multiyear software agreement. That supports the agreement part of our check. It upgrades the earlier assessment of the same event, not the number of events.
What remains open
This is worker-safety software, not Itron’s grid-edge rollout. The company did not disclose the price, what was paid, how much has been rolled out or whether PPL will renew.
What to check next
Check whether the expansion has gone live and whether Itron reports revenue, cash or a renewal. Track grid-edge agreements separately.
Evidence cited in the update

Read the dated update and full evidence · Read the original Signal

DHT crude-tanker bookings only. Separate from the earlier Gulf–Japan refined-fuel tanker update.

Partly following · Updated

What we originally said
DHT, Frontline and Scorpio could earn more if higher freight persists on available ships after costs.
What happened
On 9 November, DHT reported that it had booked 630 of 930 available spot days for the fourth quarter, about 68%, at an average US$579,900 a day. On 12 October it had reported about 50% booked at US$509,100 a day.
What we learned
More of DHT’s available crude-tanker days were booked, and the average booked rate was about 14% higher than in its October update. This supports the higher-rate part of what we flagged.
What remains open
The filing does not date each booking. These are booked rates, not completed trips or quarter-end profit. They do not prove that diesel tankers became scarce because of DHT, or that households paid more.
What to check next
Check DHT’s full fourth-quarter results for rates actually earned after costs. Track clean-tanker freight separately.
Evidence cited in the update

Read the dated update and full evidence · Read the original Signal

  • EX1550543: Exchange Online mailbox access and recovery · Partly following · Original · Later evidence

    At 10:13 a.m. Singapore time, Microsoft was still tracking messages that built up during the incident while Exchange Online recovered. Microsoft marked Exchange Online restored at 12:15 p.m. SGT.

    Partial only. The delay during recovery is documented, but no company’s reconciliation of requests, receipt of a particular message, or paid cleanup work was verified. This is the same partial already on the original Signal, not another scored hit.

A supplier disclosed gas turbine repair contracts. This is about the disclosure, not an AI data-centre order or a signed date.

Partly following · Updated

Review overdue · no later published assessment recorded · Planned

What we originally said
Act when: a named operator offers a funded, technically suitable refurbishment scope, or a supplier discloses meaningful repair-and-service bookings.
What happened
On its 12 November 2026 earnings call, Triveni Turbine said it had secured long-term gas turbine repair contracts serving power suppliers. It described US$80 million to US$90 million over four to five years as potential business, not money already earned.
What we learned
This meets one part of our 11 November check: a supplier publicly disclosed meaningful repair work. It shows that restoring existing gas turbines can generate contracts.
What remains open
The company did not name a data-centre customer for those repair orders, say when each contract was signed, or establish actual bills, payments or profit. This disclosure does not prove AI caused the bookings or that repair demand grew across the industry.
What to check next
Look for a named customer or project, date of award, and reported billing before concluding that data centres are driving paid repair work.
Evidence cited in the update
  • Triveni Turbine earnings call transcript, 12 November, page 3 · Primary source · Public access · The call cover identifies 12 November. The transcript’s indexed release is later and the event date is the earnings disclosure; exact signatures were not given. · Event · Published · Checked

Read the dated update and full evidence · Read the original Signal

Sale of operating US solar and battery projects only. Not a refinancing or profit result.

Partly following · Updated

Review overdue · no later published assessment recorded · Planned

What we originally said
We think an underappreciated opportunity may be in the sale and refinancing of existing renewable-energy assets, not just the construction of new ones.
What happened
On 10 November 2026, Altus Power and the seller’s adviser reported that Altus had acquired 92 operating projects from Arevon across 13 US states. The buyer says the deal added about 200 megawatts of solar capacity and 10 megawatt-hours of battery storage.
What we learned
This supports one part of our 5 November Signal: buyers can pay for renewable projects already running, rather than building every project from scratch.
What remains open
The parties did not disclose the purchase price, Arevon’s profit, whether it reinvested the proceeds, or whether improved market confidence caused the deal. This is a completed purchase, not proof of refinancing or a wider sales boom. The precise closing time was not disclosed.
What to check next
Look for a disclosed sale price or a later filing showing what the seller did with the money before making any claim about profit or new construction.
Evidence cited in the update
  • Altus Power: buyer’s confirmation of the Arevon purchase · Primary source · Public access · The buyer identifies project count, states and capacity. It refers back to its 10 November disclosure without naming an exact closing time. · Event · Published · Checked
  • Marathon Capital: seller adviser’s transaction disclosure · Primary source · Public access · The adviser confirms completed sale, parties, and count. Buyer is used for the battery energy unit. · Event · Published · Checked

Read the dated update and full evidence · Read the original Signal

Published changes and notices

New mortgage quotes from one tracker. Not what an existing borrower paid on renewal.

Newly disclosed evidence · Updated

What we originally said
Renewal activity may support broker work while higher payments reduce discretionary budgets.
What happened
In its 16 November report, Rightmove put the average rate on a new two-year fixed deal at 5.51%, down slightly from 5.55% the previous month. The same tracker put the rate at 4.25% before the Iran war.
What we learned
The monthly rate eased slightly, but it was still above the earlier reference. A homeowner approaching renewal should compare a written new quote with their own expiring deal and include fees.
What remains open
This tracker does not measure the rates or payments people actually agreed to when they renewed, or how their household spending changed.
What to check next
Look for comparable renewal quotes and completed refinancing data. Keep the price of a new deal separate from the monthly bill.
Evidence cited in the update

Read the dated update and full evidence · Read the original Signal

One signed compute contract and one proposed financing mix; not money received or a forecast verdict.

Milestone · Updated

What we originally said
If financing spreads stay elevated and customer receipts lag, weaker builders could delay projects or seek capital, potentially favouring selected operators and capital providers.
What happened
On 16 November, Corvex said it signed a US$103 million, three-year contract to supply computing capacity. The filing says US$26 million in customer prepayment and a US$38 million debt commitment are expected to fund US$64 million of an estimated US$78 million deployment.
What we learned
A customer can sign for capacity before the money for the equipment is in place. The debt had a binding term sheet, but still had conditions to meet before Corvex could draw it.
What remains open
The filing does not show that the debt was drawn or the advance received, or identify the final rate. It does not establish that the equipment has arrived or that the deal has earned revenue.
What to check next
Check the final loan, the customer funds and actual delivery or acceptance before treating the contract as revenue.
Evidence cited in the update
  • Corvex Form 8-K, Item 8.01 · Primary source · Public access · Company-reported signed customer contract and conditional financing terms, not a funding receipt. · Event · Published · Checked

Read the dated update and full evidence · Read the original Signal

The operator’s 24 November notice concerns the Highland Bus between Bijodaira and Murodo only.

Safety update · Updated

What we originally said
Treat 24 November as a separate day.
What happened
At 7 a.m. Japan time on 24 November, the operator confirmed that the bus between Bijodaira and Murodo would not run that day. It listed Tateyama Station to Bijodaira and Ogizawa to Murodo as running normally at that time.
What we learned
You cannot reach Murodo from the Toyama side on the suspended bus. Check the live board and your return trip before switching to the Nagano side. The warning for 25 November was not yet a cancellation.
What remains open
The notice does not prove a seat, a completed journey or a refund paid. The operator says eligible unused web tickets made unusable by the suspension can be refunded without a fee; if you picked up your ticket, ask station staff.
What to check next
Check the operator’s latest route status. If you have a web ticket, check the refund status on My Page.
Evidence cited in the update

Read the dated update and full evidence · Read the original Signal

Anthropic’s final prospectus describes its power needs. It does not confirm the specific generator deal.

Newly disclosed evidence · Updated

What we originally said
Anthropic, the company behind Claude, had reportedly agreed in late September to pay US$3.4 billion for existing commitments covering 1.7 gigawatts of Caterpillar gas-powered generators from Texas supplier OnePWR Solutions.
What happened
The final IPO prospectus says some planned data centres rely on their own gas-fired generation. It also says Anthropic may pay above normal prices for equipment that takes a long time to deliver, to bring sites online sooner.
What we learned
The filing explains why delivery dates matter. It repeats a risk described in an earlier filing. It does not confirm that Anthropic took over the reported OnePWR order.
What remains open
The prospectus does not name OnePWR or Caterpillar. It does not confirm the reported US$3.4 billion price, the 1.7 gigawatts, an equipment delivery or a supplier payment.
What to check next
Before pricing installation work, look for a signed scope and a delivery slot confirmed by the buyer or supplier.
Evidence cited in the update
  • Anthropic final IPO prospectus, filed with the SEC · Primary source · Public access · Issuer risk disclosure. Similar wording appeared in previous filings; not a transaction receipt. · Event · Published · Checked

Read the dated update and full evidence · Read the original Signal

Jensen Huang’s return as CEO and the status of the investigation as stated in the filing. This does not change the existing supplier assessment.

Milestone · Updated

What we originally said
Nvidia's board announced an independent investigation while saying it had no reason to believe secrets were compromised.
What happened
NVIDIA’s board reinstated Jensen Huang as president, CEO and a director on 22 November. NVIDIA disclosed the decision on 23 November and said the independent directors’ investigation would continue. It also said it was starting a search for a chief compliance officer.
What we learned
The CEO returned, but the investigation did not end. The compliance search is for an internal role, not a new paid contract for an outside specialist.
What remains open
The filing gives no finding, appointment for the new role, additional named outside supplier or fee.
What to check next
Watch for the investigation’s findings, a named hire, or a supplier requirement that a company can verify. The original review window stays open through 9 December.
Evidence cited in the update
  • NVIDIA Form 8-K, Item 5.02 · Primary source · Public access · Event · Published · Checked
  • NVIDIA statement on the board decision and investigation · Primary source · Public access · Company’s own account; no investigation finding or new named supplier engagement. · Event · Published · Checked

Read the dated update and full evidence · Read the original Signal

Voting rights and cash settlement are separate. This is a new disclosure of an earlier event, not a forecast outcome.

Newly disclosed evidence · Updated

Scheduled review · Planned

What we originally said
Thakral put net proceeds from a sale of Beauty Tech shares at about S$56.5 million. One line in the filing gives a conflicting price; the proceeds sections and the bookrunner support £5.05 per share. Cash settlement was expected on 23 November, not verified. The money is due to Thakral, not Beauty Tech. If a budget depends on it, wait for evidence of receipt and a separate spending decision.
What happened
In a 23 November filing, Beauty Tech said Thakral’s voting rights fell to zero on 19 November. The change happened before our Signal. The filing gives later confirmation of the voting rights, not of money arriving.
What we learned
If your budget depends on the sale, wait for Thakral to confirm receipt. Then check whether it has approved spending for your project.
What remains open
The bookrunner expected settlement on 23 November. The voting-rights notice does not show whether the expected S$56.5 million reached Thakral or whether any of it has been committed to a project.
What to check next
Look for a dated Thakral filing or accounts showing cash received after fees. Check any project budget separately.
Evidence cited in the update
  • Beauty Tech voting-rights notice, RNS 2918E · Primary source · Public access · Issuer’s filing reproduced by Halifax. It identifies the threshold date; it does not report payment. · Event · Published · Checked
  • Berenberg’s earlier placing result · Primary source · Public access · Expected cash settlement on 23 November, not confirmation of receipt. · Published · Checked

Read the dated update and full evidence · Read the original Signal

Published evidence comparisons

  • Singapore Airlines’ first Western Sydney service landed · Partial outcome · Original · Later evidence

    On 23 November, Singapore Airlines flight SQ261 landed at Western Sydney International. A flight tracker recorded 7:42 p.m. local time. The original Signal quoted a different flight number and 10:20 p.m. for that day.

    This checks the first arrival only. It does not confirm that a passenger caught the onward bus or train, or that a 10:20 p.m. arrival happened that day. It links the existing partial hit and does not add another hit.

  • Zig matched a cross-border taxi booking with a driver · Partial outcome · Original · Later evidence

    On 23 November, a Lianhe Zaobao reporter booked a Zig taxi from Tampines to Johor Bahru and was matched with a driver about an hour later. Some Android users could access the service only after updating the app.

    One booking option worked for one route and time. No completed or paid ride, repeat business, lower average fares or driver earnings were verified. This comparison links the Signal’s partial hit and does not add another hit.

  • BMZ Selects Minespider to Integrate Digital Battery Passports into EU Battery Production · Partial outcome · Original · Later evidence

    BMZ chose Minespider to set up digital battery records using factory data in Germany and Poland. BMZ Poland’s managing director described why it chose a single system.

    A named vendor selection happened. There is no published fee, payment, installed system or first live battery record. This links the Signal’s existing outcome and does not add another partial hit.

  • Spotify offers free month of podcast creator memberships · Partial outcome · Original · Later evidence

    PodcastingToday reported the launch of an offer giving eligible listeners a free month of podcast membership.

    This confirms a live offer and its published payment terms, not actual creator receipts or renewals. It is a specific exception to ordinary unpaid trials and is the same outcome already linked on the Signal, not a second partial hit.

  • Pocket Casts Relay, Reddit developer listing · Partial outcome · Original · Later evidence

    By 18 November, the Pocket Casts team’s developer listing described replacing its old Reddit feed with an app. The app sends summaries of new posts in its community to the team’s Slack channel.

    By the listing update date, one support team documented its replacement. No private delivery, shopping sales or general adoption verified. Same partial as the original article update, not a second hit.

  • Better river flows did not end England’s irrigation limits · Partial outcome · Original · Later evidence

    England still counted 431 water-taking restrictions and reported historically low levels in many irrigation reservoirs.

    No water or permission at any specific farm is established.

Browse updated Signals · Browse evidence comparisons · Read what OnTheRice learned

What we got wrong

See cases where later evidence went against the original Signal.

No verdicts marked “Against the stated outcome” appear in the public Signal update register.

Corrections and retractions

Report an error or challenge a claim

Source transparency

Open a Signal’s sources in the Evidence register to see recorded dates, access limits and links.

How to read a source link

Find the original record.
A regulator’s notice can tell you which products it covers. A company report can tell you what the company disclosed. Look for the page, table or sentence that supports the specific claim.
Look for a separate check.
News reports can add context. When several reports repeat the same announcement, they share one underlying source. Separate evidence comes from someone who did their own reporting, test or analysis.
Check dates and access.
Look for when the event happened, when the source reported it and when it was checked, where those dates are given. Some links require a login or payment. If you can see only part of a source, check which details are actually available to you.
Look for gaps and contrary evidence.
Check who, where and how long the record covers. Look for other evidence that points in a different direction. OnTheRice uses selected sources it can access, so coverage varies by topic, place, language and date.

What kind of statement are you reading?

Reported fact
What a record directly shows. If it is someone’s account of an event, check who made the statement.
Interpretation
What OnTheRice thinks the evidence may mean. Look for the reasoning and other possible explanations.
Estimate or forecast
An approximate figure or a view about what may happen next. Check the assumptions, time period and what later evidence could test.
Open question
Something the evidence available at the time leaves unresolved. Look for what information would answer it.

Try two more source checks

Research independence

OnTheRice is responsible for what it publishes. AI helps find, organise and draft research. It can miss context or repeat an error. Use the linked evidence to check the claim for yourself.

Ownership
No public disclosure on file.
Editorial and financial interests
No public disclosure on file.
Sponsorship
No public disclosure on file.
Conflicts of interest
No public disclosure on file.

Corrections and challenges

To report a mistake or broken source link, send the permanent page link, the exact passage or problem and a dated source if you have one. Published Signal updates can show a correction alongside the original prediction and its publication date.

Change history

See dated changes to published research. The original publication date and the update date describe different events.

This list shows recent public Signal updates and publication revisions. Workbench and Early revision entries record publication dates. Their reasons and any change to the article’s conclusion are unavailable in this list. The Early archive shows earlier versions and available change details.

Browse Signal update histories · Browse Early revisions

Lessons for research agents