Following so far (Hit — Dated evidence shows that every material part of the assessed forecast happened.)
0
Partly following (Partial hit — Dated evidence shows that at least one material part of the assessed forecast happened. Other parts are still open or went differently.)
24
Against the stated outcome (Miss — Dated evidence shows that the assessed outcome went against the forecast.)
0
Unresolved (Unresolved — The evidence has yet to show whether the forecasted outcome happened. Plans and related developments can still be recorded as checkpoints.)
93
Public performance and coverage
94 of 410 published Signals have at least one linked claim assessment. The number of claims eligible for assessment across all Signals is unmeasured.
These totals count one current published assessment per identifiable claim, including unresolved assessments. One Signal can contain several claims. Earlier coverage, timetable changes, safety notices and editorial cases without a matched assessment have their own counts.
The source directory contains 48 articles: 44 Long Term Signals and 4 standalone Long Term articles. These publications remain part of the Signals collection; this subset is not added to its total a second time.
301 of 301 current Workbench Signals have a recorded check. 0 have no recorded check for the current revision. This checks delivery of the published article.
Current Signals included in both partner feeds. Early and standalone Long Term are also distributed; they are outside this Signal-only count. Explicit withdrawals remain excluded.
The England report does not show how much lawful water any one farm has or whether a particular crop plan must change. Some restrictions eased from the previous week.
AEM 3Q2026 investor update, issuer document mirrored by Futu· Public issuer document mirrored by Futu; unaudited quarter. The date is 11 November 2026; no original publication clock was verified. This does not independently confirm customer orders.
Singapore’s Infocomm Media Development Authority (IMDA) reported the trial result. Its case-study page is from the same publisher.
The dates
IMDA released its report on . The case-study page was updated on . OnTheRice published the Signal on .
The limits
The release supports the energy savings reported for those two halls during the trial. Long-term savings, results at other sites and demand for independent verification remain open.
See later evidence beside what the original Signal said. Follow each case for its dates and remaining questions.
England: better river flows did not remove irrigation limits
Partly following · Updated
Scheduled review · Planned
What we originally said
For an irrigated crop commitment, local usable water and licence conditions can be more decision-relevant than national rainfall headlines.
What happened
The Environment Agency reported on 20 November that rain had improved river flows, but 431 restrictions on licences to take water were still in place. Many irrigation reservoirs remained at historic lows.
What we learned
This supports the original warning that wetter conditions do not necessarily restore usable water or permission to take it. It is the first partial rating for the earlier report, not another event.
What remains open
The England report does not show how much lawful water any one farm has or whether a particular crop plan must change. Some restrictions eased from the previous week.
What to check next
Before committing to a crop order, check the available water in the farm’s own store and the current terms of its licence.
Evidence cited in the update
Environment Agency: drought report for 13–19 November · Primary source · Public access · Date of agency update shown; exact publication time is not shown. National and regional data, not proof for a named farm. · Event · Published · Checked
Bombardier adds a service centre; paid use is still open
Partly following · Updated
Scheduled review · Planned
What we originally said
Existing-fleet service demand can reward maintenance capacity and customer relationships, subject to costs and usage.
What happened
Bombardier inaugurated its Fort Wayne service centre on 17 November. The building has about 64,500 square feet of floor space and can hold up to six aircraft.
What we learned
The original article said service-centre expansion was one part of the maintenance opportunity. The new building confirms that capacity step. This changes the earlier assessment of the same opening, not a second opening.
What remains open
A ribbon-cutting does not mean the centre has started all its planned services. It does not show how many aircraft it has serviced or how much it earned after costs.
What to check next
Look for a confirmed start of operations, the number of aircraft serviced and any separately reported cash after operating costs.
U.S. senators asked for proof before more router installations
Partly following · Updated
Scheduled review · Planned
What we originally said
2nd: maintenance reviews may require fuller network fault isolation before more cutovers.
What happened
In a 16 November letter made public the next day, U.S. senators asked the transport department and the FAA to show that tests could find a fault, that backups would work, and that a change could be undone before more routers were installed.
What we learned
That is a formal demand for stronger proof, one part of the original forecast. It is not proof the FAA finished the tests or hired someone to do them. This updates the earlier assessment of the same event.
What remains open
The letter does not establish a mandatory new test, a finished investigation, or a paid contract. We did not use it to date the agency’s installation pause.
What to check next
Look for the agency’s answer, the findings and any official testing award. Keep the original 30 November and 15 December checks separate.
One Singapore FinTech Festival vendor booked meetings without a stand
Partly following · Updated
Scheduled review · Planned
What we originally said
The overlooked asset is the meeting schedule, not the conference stage.
What happened
At 6:01 pm Singapore time on 19 November, EntropyX Labs said it had booked 14 meetings and met 45 people. The firm said it had no stand and arranged meetings by appointment. It also reported three new clients, but did not say which appointments led to them.
What we learned
One FinTech Festival vendor used scheduled meetings to reach potential customers without a stand. That supports the meeting part of our original case, not the case for selling follow-up work.
What remains open
The figures came from the vendor. They do not show how many booked meetings went ahead, what the new clients bought, or whether anyone paid for a pilot or outside follow-up work. They are not festival totals.
What to check next
To test the follow-up business, match one meeting to a written pilot scope and an accepted invoice. Do not treat meetings or reported clients as cash received.
Evidence cited in the update
EntropyX Labs: dated Singapore FinTech Festival field report · Primary source · Public access · Dated company self-report for one vendor. No attendee-level attribution, contract, payment, or event-wide conversion. · Event · Published · Checked
AAR’s 17 November bond sale, not the MRO Holdings acquisition
Partly following · Updated
Scheduled review · Planned
What we originally said
On/after 17 November verify an actual closing notice for the notes.
What happened
AAR issued US$955 million of notes due in 2031 and US$960 million due in 2034 on 17 November. After discounts and commissions, the company placed the proceeds in escrow, a separate account that holds the money until conditions are met.
What we learned
The original article selected the 17 November note closing as a financing step to verify. The SEC filing confirms that step. This changes the previous assessment of the same event to partial; it is not a second event or an acquisition closing.
What remains open
Still unverified: whether the funds left escrow, the acquisition closed, or the repairs business earned enough to cover interest and the effect of issuing new shares.
What to check next
Check AAR’s filings for release of the funds and the acquisition closing. Then compare the cash the business earns with its financing costs and the effect on earnings per share.
A webinar scheduled for 19 November at 02:00 Singapore time had not happened by the research cutoff.
What happened
What we originally said: HeyGen had scheduled a live Avatar 6 demo for 19 November at 2 am Singapore time. What changed: HeyGen now lists that demo among its on-demand webinars and links to a replay.
What we learned
You can use the replay link to look for the feature you want to test. A product demo does not tell you whether customers watched longer, placed more orders or paid for a second video.
What remains open
We verified the replay listing and link, not playback, attendance or when the replay first appeared. We have no matched customer results.
What to check next
For a buying decision, compare the same script and offer with a phone video. Check the cost per usable video and whether a customer actually places a second paid order.
Evidence cited in the update
HeyGen's on-demand webinar list · Primary source · Public access · Public listing labels the original November 18 Pacific time event Watch replay. · Checked
HeyGen’s Avatar 6 demo and replay link · Primary source · Public access · Public event page and replay target; exact upload time and playback not verified. · Checked
Texas state environmental reviews resumed. Lavon’s separate local filing pause applies only inside city limits.
Plan changed · Updated
Scheduled review · Planned
What we originally said
If new supply is delayed, suitable already operating spare capacity could command stronger demand or pricing, making DLR and EQIX candidates to examine.
What happened
On 17 November, the Texas Tribune quoted the state environmental agency saying normal permit reviews had resumed. A separate state letter on that date records one Royse City project’s air-emissions registration. Lavon, a different city, adopted a 90-day pause on certain local data-centre filings.
What we learned
State environmental review and city planning are separate steps. A state registration does not settle a local permit or show that the site can connect to the power grid. The state restart weakens the idea of one uniform pause across Texas.
What remains open
We have not verified an electricity connection, an opened site, higher rents or stronger customer demand. The proposed statewide law is separate.
What to check next
For a project you follow, check the notice from its city, the state permit record and the written grid connection separately. Check actual leases and spare space before drawing a price conclusion.
Evidence cited in the update
Texas Tribune: state environmental reviews resume · Independent evidence · Public access · Quotes a written Texas Commission on Environmental Quality statement; review is not approval. · Event · Published · Checked
22 November 2026 Singapore-time check for the grey Tomica No.85 Subaru Forester First Press, barcode 4904810092155. Retail listing observation; not a forecast assessment.
Milestone · Updated
What we originally said
Maker listed it at the same price with no stock. HobbyLink also showed no stock for the exact barcode.
What happened
What we originally said: The maker’s shop and HobbyLink Japan showed no stock for the grey first edition when we checked.
What changed: On 22 November (Singapore time), Japanese retailer Excel Unit listed the grey model, barcode 4904810092155, in stock at ¥594 including Japanese tax, before delivery. The maker’s shop still showed it out of stock.
What we learned
What that means now: If you want the grey version, check the barcode, current stock and total cost with delivery before paying a reseller more.
What remains open
We did not test checkout, place an order or verify delivery. We do not know when Excel Unit first listed stock. HobbyLink’s page showed conflicting stock messages, so it is not counted as a second confirmed listing. This is not a maker restock, a resale result or a forecast hit.
What to check next
Compare actual delivered prices for the same barcode. A listing alone does not show what a buyer paid or what a seller earned.
Evidence cited in the update
Excel Unit: grey First Press stock and price · Primary source · Public access · The page displayed an in-stock mark for the exact barcode; checkout and shipping not tested. · Checked
Takara Tomy Mall: grey First Press · Primary source · Public access · The maker still showed out of stock for the same barcode. · Checked
Evidence pointing the other way
HobbyLink Japan: grey First Press · Primary source · Public access · The main product panel and a separate out-of-stock message disagreed; this source is not used to establish availability. · Checked
22 November check of current HAIARA W5 PRO safety guidance; date the notice changed is not known.
Safety update · Updated
Review overdue · no later published assessment recorded · Planned
What we originally said
The remedy requires stopping use, contacting Mitrytech, a photo with recalled written on the device, and confirmation of lawful disposal for a full refund.
What happened
What we originally said: We described the steps Mitrytech had offered for a refund.
What changed: When we checked on 22 November (Singapore time), the U.S. Consumer Product Safety Commission’s recall page said Mitrytech was no longer honoring the recall. The older refund steps still appear lower on the page. Do not rely on those steps or wait for a refund before acting.
What we learned
If your black HAIARA W5 PRO has “20W” on the front and no date code on the side, stop using it. Do not pack it for a trip, sell it or give it away. Do not put it in the trash or regular recycling.
What remains open
The notice does not say when the refund instructions stopped applying. It does not establish what happened to individual refund requests.
What to check next
Call your local hazardous-waste service before taking the power bank anywhere. Ask if it accepts defective lithium-ion batteries and how to dispose of this unit safely.
First Hong Kong market session covered by the original check; not a forecast.
Milestone · Updated
Review overdue · no later published assessment recorded · Planned
What we originally said
Monitor the 12 November China and Hong Kong market response
What happened
Hong Kong Exchange records show that on 12 November, COSCO Shipping Development closed at HK$0.875, down about 1.13% from HK$0.885. COSCO Shipping Energy closed at HK$15.10, down about 2.96% from HK$15.56.
What we learned
This records the Hong Kong part of our original market check. It does not show that the proposed 16-tanker deal caused the moves. It also does not show shareholder approval, funding or supplier payment.
What remains open
No trade or return was verified. The exchange prices describe two listings and one day; the 16-tanker deal’s circular and approvals are separate.
What to check next
Watch the exact 16-tanker shareholder circular expected by 30 November, and keep approvals, funded orders and deliveries separate.
Existing participation window elapsed; no new deadline announced.
Deadline changed · Updated
Review overdue · no later published assessment recorded · Planned
What we originally said
Approach potential partners before the application deadline and seek a written scope by 4 December.
What happened
The dates in the official SNCF Réseau notice have now passed for all four lots. The notice still prints 19 November at 17:00 with a UTC+02:00 offset. Either the printed offset or the usual French winter time puts the date in the past. We did not find an official extension.
What we learned
Our original invitation to prepare before the deadline is no longer current. Do not assume that a late application will be accepted. Check the buyer’s portal for any official reopening or new notice. The 4 December scope check in the article was our check, not the tender deadline.
What remains open
We could not confirm a buyer-portal change, an award, a lab order or payment. The printed time-zone discrepancy has not been resolved.
What to check next
Check the buyer’s exact notice for reopening or an award. If work is awarded, verify lab acceptance and payment separately.
First government working-group meeting, separate from buying or testing equipment.
Milestone · Updated
Review overdue · no later published assessment recorded · Planned
What we originally said
The practical challenge extends beyond buying a detector. Exam staff need to know what an alert means and how to check it without unfairly accusing a candidate. A radio alert alone does not establish cheating.
What happened
South Korea’s Ministry of Employment and Labor says its working group on national qualification exams met for the first time on 19 November at 4 p.m. Korean time. The ministry asked the group to develop ways to prevent cheating involving smart devices.
What we learned
The review has moved from a public instruction to a meeting. It does not show that the budget passed or that an exam centre bought or tested a detector. An alert by itself is still not proof that someone cheated.
What remains open
We have not verified a final appropriation, a supplier award, or results showing how reliably staff can check alerts.
What to check next
Look for a final budget or procurement record, followed separately by results that show how often the system raises a wrong alert.
HDB’s final table showed 489 applications for 464 four-room flats at Sembawang Anchor. For each flat set aside for its group, the rates were 0.7 applications from first-time families and 4.1 from second-time families.
These rounded rates do not tell an individual family its ballot result, queue position or chance of getting a flat.
OCBC joined a trial with ST Engineering and other partners. The supplier’s tool is meant to check how ready the bank is and which upgrades should come first.
No finished audit, paid fee or live encryption upgrade was verified.
Earlier public disclosures establish provider participation before the original Signal. The November notice adds scope rather than establishing first participation.
The 12 November update added an unsupported midnight expiration time to the 20 November extension. PMA's 6 November statement specifies the date but no expiration clock or timezone.
Open a Signal’s sources in the Evidence register to see recorded dates, access limits and links.
How to read a source link
Find the original record.
A regulator’s notice can tell you which products it covers. A company report can tell you what the company disclosed. Look for the page, table or sentence that supports the specific claim.
Look for a separate check.
News reports can add context. When several reports repeat the same announcement, they share one underlying source. Separate evidence comes from someone who did their own reporting, test or analysis.
Check dates and access.
Look for when the event happened, when the source reported it and when it was checked, where those dates are given. Some links require a login or payment. If you can see only part of a source, check which details are actually available to you.
Look for gaps and contrary evidence.
Check who, where and how long the record covers. Look for other evidence that points in a different direction. OnTheRice uses selected sources it can access, so coverage varies by topic, place, language and date.
What kind of statement are you reading?
Reported fact
What a record directly shows. If it is someone’s account of an event, check who made the statement.
Interpretation
What OnTheRice thinks the evidence may mean. Look for the reasoning and other possible explanations.
Estimate or forecast
An approximate figure or a view about what may happen next. Check the assumptions, time period and what later evidence could test.
Open question
Something the evidence available at the time leaves unresolved. Look for what information would answer it.
OnTheRice is responsible for what it publishes. AI helps find, organise and draft research. It can miss context or repeat an error. Use the linked evidence to check the claim for yourself.
To report a mistake or broken source link, send the permanent page link, the exact passage or problem and a dated source if you have one. Published Signal updates can show a correction alongside the original prediction and its publication date.
This list shows recent public Signal updates and publication revisions. Workbench and Early revision entries record publication dates. Their reasons and any change to the article’s conclusion are unavailable in this list. The Early archive shows earlier versions and available change details.