Following so far (Hit — Dated evidence shows that every material part of the assessed forecast happened.)
0
Partly following (Partial hit — Dated evidence shows that at least one material part of the assessed forecast happened. Other parts are still open or went differently.)
16
Against the stated outcome (Miss — Dated evidence shows that the assessed outcome went against the forecast.)
0
Unresolved (Unresolved — The evidence has yet to show whether the forecasted outcome happened. Plans and related developments can still be recorded as checkpoints.)
96
Public performance and coverage
93 of 402 published Signals have at least one linked claim assessment. The number of claims eligible for assessment across all Signals is unmeasured.
These totals count one current published assessment per identifiable claim, including unresolved assessments. One Signal can contain several claims. Earlier coverage, timetable changes, safety notices and editorial cases without a matched assessment have their own counts.
The source directory contains 44 articles: 40 Long Term Signals and 4 standalone Long Term articles. These publications remain part of the Signals collection; this subset is not added to its total a second time.
293 of 293 current Workbench Signals have a recorded check. 0 have no recorded check for the current revision. This checks delivery of the published article.
Current Signals included in both partner feeds. Early and standalone Long Term are also distributed; they are outside this Signal-only count. Explicit withdrawals remain excluded.
A freight benchmark is not proof that the war caused the increase, ships switched cargoes, a particular company earned more, or households paid higher prices.
Singapore’s Infocomm Media Development Authority (IMDA) reported the trial result. Its case-study page is from the same publisher.
The dates
IMDA released its report on . The case-study page was updated on . OnTheRice published the Signal on .
The limits
The release supports the energy savings reported for those two halls during the trial. Long-term savings, results at other sites and demand for independent verification remain open.
See later evidence beside what the original Signal said. Follow each case for its dates and remaining questions.
Partial hit: the tracked Gulf–Japan clean-tanker benchmark rose again. Rates on other routes and ship sizes were mixed.
Partly following · Updated
What we originally said
Compare current freight, contracted earnings, utilisation and insurance before acting.
What happened
The Baltic Exchange’s 20 November report put its 75,000-tonne Gulf-to-Japan clean-tanker benchmark at 1,049 Worldscale points, up 36 over the week. Its previous report had shown an eight-point increase on the same benchmark. The 55,000-tonne benchmark on that route was flat in the latest report.
What we learned
Higher rates for shipping refined fuel were one of the checks the original Signal called for. This benchmark rose in two successive reports, but other routes and ship sizes did not all rise.
What remains open
A freight benchmark is not proof that the war caused the increase, ships switched cargoes, a particular company earned more, or households paid higher prices.
What to check next
Look for actual cargo or ship movements, comparable rates on other routes, and net earnings after fuel and insurance.
Partial hit: the bookbuild and final margin were set; the offer amount is not collected cash.
Partly following · Updated
What we originally said
Check 23 Nov bookbuild; A$150 max sample effort; ask by 23 Nov; stop without mandate or if final margin materially changes.
What happened
New Hope said on 18 November that it had completed the bookbuild ahead of the original indicative date. It increased the offer from about A$250 million to A$500 million and set the margin at 4.00% a year above the three-month bank bill swap rate.
What we learned
The original Signal flagged the bookbuild and final margin as the next points to check. Both are now verified. The new amount is the size of the offer, not money the company had received.
What remains open
This does not verify allocation, settlement, investor distributions or any paid advisory work. The announcement confirms the terms-setting step only.
What to check next
Check the eventual allotment, issue, settlement and any distributions separately.
Partial hit: an Indian battery-storage project awarded an equipment order. Its link to the two specific funding programmes is not confirmed.
Partly following · Updated
What we originally said
Equipment, testing and industrial-service suppliers could receive orders before mineral plants reach full output or storage projects begin operating.
What happened
On 19 November, Waaree Transpower said it had secured an NTPC order worth more than ₹100 crore to supply transformers for a battery-storage project. The transformers are rated from 11 to 22 MVA. The order supports the Signal’s equipment-order component.
What we learned
This verifies the equipment order, not whether the storage project has started operating. It does not show that the supplier has delivered the equipment or received payment.
What remains open
We did not verify a link between this award and either funding programme in the original Signal. Delivery, payment, plant output, project operating status and any connection to domestic mineral processing remain unverified.
What to check next
Look for a project-level funding or tender reference, followed by delivery and payment evidence.
Evidence cited in the update
ETEnergyworld: Waaree’s statement on the NTPC transformer order · Repeats another source · Public access · Reports and directly quotes the order announcement; does not show NTPC’s underlying contract, the funding link or any payment. · Event · Published · Checked
Mercom India: order scope and amount · Repeats another source · Public access · Reports the same issuer disclosure. Not a second underlying confirmation. · Event · Published · Checked
England: fewer restrictions on taking water, but a farm’s usable water still needs a local check.
Unresolved · Updated
What we originally said
For an irrigated crop commitment, local usable water and licence conditions can be more decision-relevant than national rainfall headlines.
What happened
In its 20 November update, England’s Environment Agency reported 431 restrictions on licences to take water, down from 486 the previous week. It said recent rain raised river flows. Yet the reservoirs it tracks across England were at 58% of capacity on 17 November, and it said many irrigation reservoirs were still at historic lows.
What we learned
A better river reading does not refill a farm’s reservoir or change its licence by itself. Before setting the acreage or placing a fixed crop order, ask the grower how much water is stored and what the current licence lets them draw.
What remains open
The report does not show that a given farm gained usable water, changed planting plans or filled an order. The England-wide storage figure is not a reading of farm reservoirs. This is a monitoring update, not a confirmed forecast result.
What to check next
Check the next Environment Agency drought update. For a specific crop order, look for the farm’s actual storage and licence terms, and whether the grower changed the acreage or order size.
Evidence cited in the update
Environment Agency: drought report for 13–19 November · Primary source · Public access · Date of agency update shown; exact publication time is not shown. National and regional data, not proof for a named farm. · Event · Published · Checked
The signed agreement records a US$9 million equipment order from ASE. It says half is due within 60 days of signing and the other half can be billed after all equipment is delivered.
This is the same supplier order already marked partial on the original Signal, not another forecast win. The agreement does not show that ASE paid Ainos, that the order served the expansion we covered, or when the new production line first earned revenue.
Mahanadi Coalfields · early large-investor share allocation
Unresolved · Updated
Review overdue · no later published assessment recorded · Planned
What we originally said
Read final terms, compare the subsidiary’s earnings and cash economics with Coal India, and monitor announced use of proceeds.
What happened
What we originally said: Check the final sale terms and how Coal India uses any proceeds.
What changed: On 18 November, Mahanadi said it had allocated about 168.8 million shares at ₹136 each to early large investors. The allocation is worth about ₹22.95 billion before costs. This is only the early allocation. It does not set the final price for the wider public offer.
What that means now: Coal India is selling existing shares. This is not new funding for the mines. The allocation does not show how much cash Coal India has received or how it will use it.
What we learned
Keep the early allocation separate from the public offer, payment and the parent’s use of cash. The prospectus schedules public bidding from 19 to 23 November.
What remains open
Final public pricing, settled proceeds after costs, and Coal India’s allocation of any cash have not been verified. This is a procedural milestone, not a forecast hit.
What to check next
Look for the official final price and allotment, the seller’s settled net proceeds, and what it does with the money.
SEBI-hosted Mahanadi abridged prospectus · Primary source · Public access · Scheduled period and offer-for-sale terms. Not final pricing or settlement evidence. · Event · Published · Checked
22 November 2026 Singapore-time check for the grey Tomica No.85 Subaru Forester First Press, barcode 4904810092155. Retail listing observation; not a forecast assessment.
Milestone · Updated
What we originally said
Maker listed it at the same price with no stock. HobbyLink also showed no stock for the exact barcode.
What happened
What we originally said: The maker’s shop and HobbyLink Japan showed no stock for the grey first edition when we checked.
What changed: On 22 November (Singapore time), Japanese retailer Excel Unit listed the grey model, barcode 4904810092155, in stock at ¥594 including Japanese tax, before delivery. The maker’s shop still showed it out of stock.
What we learned
What that means now: If you want the grey version, check the barcode, current stock and total cost with delivery before paying a reseller more.
What remains open
We did not test checkout, place an order or verify delivery. We do not know when Excel Unit first listed stock. HobbyLink’s page showed conflicting stock messages, so it is not counted as a second confirmed listing. This is not a maker restock, a resale result or a forecast hit.
What to check next
Compare actual delivered prices for the same barcode. A listing alone does not show what a buyer paid or what a seller earned.
Evidence cited in the update
Excel Unit: grey First Press stock and price · Primary source · Public access · The page displayed an in-stock mark for the exact barcode; checkout and shipping not tested. · Checked
Takara Tomy Mall: grey First Press · Primary source · Public access · The maker still showed out of stock for the same barcode. · Checked
Evidence pointing the other way
HobbyLink Japan: grey First Press · Primary source · Public access · The main product panel and a separate out-of-stock message disagreed; this source is not used to establish availability. · Checked
22 November check of current HAIARA W5 PRO safety guidance; date the notice changed is not known.
Safety update · Updated
Scheduled review · Planned
What we originally said
The remedy requires stopping use, contacting Mitrytech, a photo with recalled written on the device, and confirmation of lawful disposal for a full refund.
What happened
What we originally said: We described the steps Mitrytech had offered for a refund.
What changed: When we checked on 22 November (Singapore time), the U.S. Consumer Product Safety Commission’s recall page said Mitrytech was no longer honoring the recall. The older refund steps still appear lower on the page. Do not rely on those steps or wait for a refund before acting.
What we learned
If your black HAIARA W5 PRO has “20W” on the front and no date code on the side, stop using it. Do not pack it for a trip, sell it or give it away. Do not put it in the trash or regular recycling.
What remains open
The notice does not say when the refund instructions stopped applying. It does not establish what happened to individual refund requests.
What to check next
Call your local hazardous-waste service before taking the power bank anywhere. Ask if it accepts defective lithium-ion batteries and how to dispose of this unit safely.
First Hong Kong market session covered by the original check; not a forecast.
Milestone · Updated
Review overdue · no later published assessment recorded · Planned
What we originally said
Monitor the 12 November China and Hong Kong market response
What happened
Hong Kong Exchange records show that on 12 November, COSCO Shipping Development closed at HK$0.875, down about 1.13% from HK$0.885. COSCO Shipping Energy closed at HK$15.10, down about 2.96% from HK$15.56.
What we learned
This records the Hong Kong part of our original market check. It does not show that the proposed 16-tanker deal caused the moves. It also does not show shareholder approval, funding or supplier payment.
What remains open
No trade or return was verified. The exchange prices describe two listings and one day; the 16-tanker deal’s circular and approvals are separate.
What to check next
Watch the exact 16-tanker shareholder circular expected by 30 November, and keep approvals, funded orders and deliveries separate.
Existing participation window elapsed; no new deadline announced.
Deadline changed · Updated
Review overdue · no later published assessment recorded · Planned
What we originally said
Approach potential partners before the application deadline and seek a written scope by 4 December.
What happened
The dates in the official SNCF Réseau notice have now passed for all four lots. The notice still prints 19 November at 17:00 with a UTC+02:00 offset. Either the printed offset or the usual French winter time puts the date in the past. We did not find an official extension.
What we learned
Our original invitation to prepare before the deadline is no longer current. Do not assume that a late application will be accepted. Check the buyer’s portal for any official reopening or new notice. The 4 December scope check in the article was our check, not the tender deadline.
What remains open
We could not confirm a buyer-portal change, an award, a lab order or payment. The printed time-zone discrepancy has not been resolved.
What to check next
Check the buyer’s exact notice for reopening or an award. If work is awarded, verify lab acceptance and payment separately.
First government working-group meeting, separate from buying or testing equipment.
Milestone · Updated
Review overdue · no later published assessment recorded · Planned
What we originally said
The practical challenge extends beyond buying a detector. Exam staff need to know what an alert means and how to check it without unfairly accusing a candidate. A radio alert alone does not establish cheating.
What happened
South Korea’s Ministry of Employment and Labor says its working group on national qualification exams met for the first time on 19 November at 4 p.m. Korean time. The ministry asked the group to develop ways to prevent cheating involving smart devices.
What we learned
The review has moved from a public instruction to a meeting. It does not show that the budget passed or that an exam centre bought or tested a detector. An alert by itself is still not proof that someone cheated.
What remains open
We have not verified a final appropriation, a supplier award, or results showing how reliably staff can check alerts.
What to check next
Look for a final budget or procurement record, followed separately by results that show how often the system raises a wrong alert.
First market session after the results, not proof of business performance.
Milestone · Updated
Review overdue · no later published assessment recorded · Planned
What we originally said
Review the first post-announcement trading response on 12 November
What happened
AEM’s shares closed at S$7.05 on 11 November. They opened at S$7.48 on 12 November but closed at S$6.80, about 3.55% below the previous close. We checked two historical price tables for the same listing.
What we learned
The opening rise did not hold. One trading day does not explain why investors traded or show that AEM collected cash, improved profits or qualified equipment with a customer.
What remains open
These are past prices, not a quote for a purchase. We did not verify why the price moved.
What to check next
Check the next company results for actual sales, cash generated and outstanding customer bills.
Evidence cited in the update
Stock Analysis historical Singapore price table · Independent evidence · Public access · Historic vendor observation. The page is updated continually; event date is the trading day, not page publication. · Event · Checked
FT historical Singapore price table · Independent evidence · Public access · Historic vendor observation. The page is updated continually; event date is the trading day, not page publication. · Event · Checked
Lumberton City Council unanimously adopted rules for future data centres on 9 November. The rules cover where centres can be built, water use, noise and environmental standards. The council also provided for resident input in talks with developers.
The vote set rules for future proposals. A specific project, developer commitments and the actual effects on residents remain unverified.
Earlier public disclosures establish provider participation before the original Signal. The November notice adds scope rather than establishing first participation.
The 12 November update added an unsupported midnight expiration time to the 20 November extension. PMA's 6 November statement specifies the date but no expiration clock or timezone.
Open a Signal’s sources in the Evidence register to see recorded dates, access limits and links.
How to read a source link
Find the original record.
A regulator’s notice can tell you which products it covers. A company report can tell you what the company disclosed. Look for the page, table or sentence that supports the specific claim.
Look for a separate check.
News reports can add context. When several reports repeat the same announcement, they share one underlying source. Separate evidence comes from someone who did their own reporting, test or analysis.
Check dates and access.
Look for when the event happened, when the source reported it and when it was checked, where those dates are given. Some links require a login or payment. If you can see only part of a source, check which details are actually available to you.
Look for gaps and contrary evidence.
Check who, where and how long the record covers. Look for other evidence that points in a different direction. OnTheRice uses selected sources it can access, so coverage varies by topic, place, language and date.
What kind of statement are you reading?
Reported fact
What a record directly shows. If it is someone’s account of an event, check who made the statement.
Interpretation
What OnTheRice thinks the evidence may mean. Look for the reasoning and other possible explanations.
Estimate or forecast
An approximate figure or a view about what may happen next. Check the assumptions, time period and what later evidence could test.
Open question
Something the evidence available at the time leaves unresolved. Look for what information would answer it.
OnTheRice is responsible for what it publishes. AI helps find, organise and draft research. It can miss context or repeat an error. Use the linked evidence to check the claim for yourself.
To report a mistake or broken source link, send the permanent page link, the exact passage or problem and a dated source if you have one. Published Signal updates can show a correction alongside the original prediction and its publication date.
This list shows recent public Signal updates and publication revisions. Workbench and Early revision entries record publication dates. Their reasons and any change to the article’s conclusion are unavailable in this list. The Early archive shows earlier versions and available change details.